One coordinated plan for the entire house

Whole-Home Renovation in Montgomery County, Maryland

A whole-home renovation is a chance to fix the house as a system. Layout, structure, plumbing, wiring, heating, insulation, windows and finishes all affect one another. Treating them as a series of separate room projects creates rework and leaves important problems buried behind new surfaces.

Request a consultation
Open living area with white oak floors in a completed home

A successful project resolves the work behind the walls with the same care as the rooms you see.

Dena House organizes major renovations around a coordinated set of drawings, an explicit scope and a sequence that follows the building. We work with older houses where previous additions, undocumented changes and aging systems have to be understood before the new work can proceed. Engineering leadership helps the team distinguish between a cosmetic issue and a condition that affects structure, code or long-term performance.

Scope

What whole-home renovation in montgomery county, maryland includes

01

Existing-condition investigation

We review available records, measure the house and identify where limited exploratory openings can reduce uncertainty. Foundations, bearing lines, mechanical spaces and service capacities are studied before the design is treated as complete.

02

Layout and structural work

Scope may include reconfiguring stairs, opening rooms, adding beams and posts, rebuilding damaged framing, modifying windows and doors, and coordinating new work with existing foundations and floor systems.

03

Building systems

Whole-home projects are the right time to evaluate supply and drain piping, electrical service and panels, HVAC equipment and distribution, fire protection, air sealing and insulation. Systems are sized and routed around the final plan.

04

Interiors and closeout

After rough inspections, we coordinate drywall, millwork, kitchens, bathrooms, flooring, tile, painting, fixtures and final inspections. A room-by-room completion list keeps details visible through the final walkthrough.

Budget

What drives the investment

01

Budget starts with how much of the house is being opened. A renovation that preserves most walls and systems is different from a down-to-the-studs project with new plumbing, electrical, HVAC and structural changes. Occupied versus vacant construction also changes protection and sequencing.

02

Older houses can contain concealed water damage, undersized framing, obsolete wiring, abandoned utilities or previous work that does not match the drawings. A contingency is not a vague extra; it is a planned reserve for conditions that cannot be verified before demolition.

03

Finish level matters, but the largest early decisions are usually scope and systems. We organize estimates so required infrastructure is not hidden inside decorative allowances, allowing you to protect the parts of the project that are hardest to change later.

Working timeline

Plan in phases, with time for decisions.

These are planning ranges rather than promises. Address, scope, design completeness, review agencies, procurement and concealed conditions all affect the actual schedule.

3–8+ months

Investigation and design

Measured drawings, selective investigation, design development, engineering, energy and systems decisions, selections and pricing.

1–4+ months

Permits and procurement

Jurisdictional review, revisions and early release of long-lead windows, equipment, cabinetry and finish material.

7–18+ months

Construction

Demolition through final inspection; scale, structural scope, system replacement, finish level and procurement all affect duration.

Before design advances

Three planning decisions to make early

  1. For a broad renovation, moving out is usually faster and safer than trying to phase the work around daily life. The decision should be made before logistics and schedule are finalized.
  2. Create a complete decisions schedule. Door hardware, plumbing trim, lighting, tile, cabinetry and paint can each hold up a different trade if selections arrive late.
  3. Define what existing elements will be restored, reused, replaced or left untouched. Clear limits prevent assumptions from turning into scope gaps during construction.

Questions we hear

Whole-Home Renovation FAQ

Should we renovate all at once or in phases?

If systems, structure and layouts overlap, one coordinated project is often more efficient. Phasing can work when areas are truly independent, but it may repeat protection, mobilization and finish work.

Can we live in the house during a whole-home renovation?

For a major project, we generally recommend alternate housing. Dust, noise, utility shutdowns and restricted egress can make full-house work impractical to occupy safely.

How do you handle unknown conditions?

We investigate what can be checked before construction, carry a defined contingency and document concealed conditions with scope, schedule and price before extra work proceeds.

Will we need to replace all the systems?

Not automatically. We evaluate condition, capacity, code implications and how each system fits the proposed plan, then make the replacement decision with you.

Who coordinates the architect and engineers?

Dena House can work with your existing design team or participate in assembling and coordinating the consultants needed for the scope.